Guangdong, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
207
Year of Establishment:
2011-12-15
Management System Certification:
ISO9001:2008, ISO14001:2004, OHSAS18001:2007
Average Lead Time:
Peak season lead time: 1-3 months
Off season lead time: 1-3 months
OEM/ODM Service

Prefabricated Steel Structure, Steel Structure Factrory, Prefabricated Building manufacturer / supplier in China, offering Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory, Light Frame Building Material with Fabrication Construction for Pre-Engineered Steel Structure Warehouse, Professional Design High Quality Customized Modern Economic Steel Structure Warehouse and so on.

Diamond Member Since 2017
Audited Supplier
Supplier Homepage Products Steel Structure Accessories Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory

Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory

Get Latest Price
Min. Order / Reference FOB Price
1,000 Tons US $30-70/ Ton
Port: Guangzhou, China
Production Capacity: 10000ton/Year
Payment Terms: L/C, T/T
Type: Light Section Steel
Standard: GB, ASTM, DIN, JIS, AISI, BS
Trademark: Quality Carbon Structural Steel and Alloy Structural Steel, YL
Forming: Hot-Rolled Steel
Connection Form: Welded Connection
Member: Steel Frame

You Might Also Like

Loading...

Basic Info

Model NO.
YL180319005
Type of Steel For Building Structure
Cold Forming Sectional Steel
Carbon Structural Steel
Q345
Residential Wall Structure
Wallboard
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Transport Package
by Sea
Specification
GB
Origin
Guangdong, China
HS Code
73089000
Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory 

1. The characteristics of prefab warehouse steel structure building
  1. Higher reliability of steel work. Long using time up to 50 years;
  2. Steel structure is impact, stable and good anti-seismic of the weight is light.        
  3. Steel structure used for a higher degree of industrialization.
  4. Steel structures can be assembled quickly and accurately, time saving and labor saving
  5. Large interior space of steel structure or steel frame, the max span of prefab steel structure can reach 80meters      
  6. Likely to cause sealing structure.
  7. Beautiful appearance: can use different colors and structure.  
  8. Environment friendly: Most of the excess material can be 100% recycled;
  9. Lower cost and easy maintenance.
  10. Flexible:   can be dismantled and enlarged  
  11. Manufacture under complete quality control system---ISO9001/ISO14000.

Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory





2. Company Profile of Union steel structure:

Union Construction Group (www.unionstructure.com) is a large enterprise in China that specializes in design, manufacturing, construction and complete professional management of structural steel construction. we have 22 years experience and about 10 national inventions and practical patents, and our products and services cover: various lights structural steel construction, steel bridge structure, large-span structural steel construction, high-rise structural steel construction, manufacturing of various light/heavy H structural steels, box beam columns, pipe trusses and other main steel frames etc that used for warehouse, office, villa, gas station, gymnasium, swimming pool, hotel, exhibition hall, car parking, aircraft hangars, garage, poultry shed, container house, prefabricated house and so on. Our factory has national steel construction manufacturer with Grade A qualifications, more, being the most competitive steel construction enterprise in China.

Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory


3. Specifications of steel frame:
No.ItemDetails of steel structure building or steel frame
1MaterialMaterialcarbon structural steel
2ProduceLead timeNormal 45days after contract according to quantity.
3QualityCertificationQuality certificate from factory, the third party by client request.
4DimensionsLengthH beam: 4000-15000mm
5Thickness:web plate: 6-32mm
6wing plate: 6-40mm
7Height200-1200mm
8ColorAccording to customers
9SizeMOQ is 1000 m2, width * length * eave height,
10Main componentsBaseCement and steel foundation bolts
11Main frameH Steel beam, Q235 Q345 steel H beam and columns, painted or galvanized, box steel, galvanized C section or steel pipe
12Secondary frame :galvanized C or Z purlin , steel bracing , tie bar , knee brace ,flashing etc.
13MaterialQ235B, Q345B or others as buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS, 
14PurlinC or  Z purlin: Size from C120~C320, Z100~Z20
15ColumnX-type, tree type ,lattice, Cross, Box etc.
16BoltPlain bolt and High-strength bolt
17Roof & wallPU sandwich panel, Rockwool sandwich panel or Corrugated steel sheet
18 Canopysteel sheet, PU sandwich panel, Rockwool sandwich panel
19DoorSliding or rolling door
20WindowAluminium alloy window
21SurfaceTwo lays of rust-proof painting or Hot Dip Galvanized
22Sheet0.5mm or 0.6mm galvanized sheet
23AccessoriesSemi-transparent skylight belts, Ventilators,down pipe, Galvanized gutter, Trim, flashing, etc
24Finishing optionsVast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized.
25Usages1. Steel workshop, steel warehouse, steel structure plant
262. Steel web frame structure
273. Steel H-column and steel H-beam
284. Portal frame products
295. High rise building project
306. Others steel structure buildings
31Packing1. Container 20 feet: Inside: 5.69m x 2.34m x 2.18m, Gross weight: 17.5 ton, volume is 24-26m3.
2. Container of 40 feet: Inside: 11.8m x 2.34m x 2.18m, Gross weight: 22 ton, volume is 54m3.
3. HC container: Inside: 13.58m x 2.34m x 2.71m, Gross weight: 29 ton, volume is 86m3.
4. All of the steel columns &beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
32
33
34
35Drawing:According to drawings or steel structure design according to customer's requirement.
36Design ParametersIf you need we design for you, please supply us the following parameter together with detail size:
1) length, width, height, eave height, roof pitch, etc
2) wind load, snow load, raining condition, aseismic requirements, etc
3) Demands for doors and windows.
4) Other information if necessary.
37
38
39
40
41Production WorkflowPrefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory
 
42InstallationPrefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory
 

4.Quality and certificater of Union Steel structure.
Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory



Prefab Prefabricated Industrial Building Steel Structure Construction Workshop Warehouse Buildings Construction Factory

 

Send your message to this supplier

*From:
*To:
avatar Mr. Baron Kuo
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now